MILES AXLE Translation. Region: Russian Federation –
Source: Novosibirsk State University – Novosibirsk State University –
At the second stage of the modern NSU campus — in the buildings of the educational and scientific center of the Institute of Medicine and Medical Technologies (UNC IMMT) and the scientific research center (SRC) — work has begun on installing ventilated facades. Work is also underway to install translucent enclosing structures (stained glass). The construction readiness of the facilities is 18.2% and 15.4%, respectively. The construction of the facilities is carried out within the framework of national project “Science and Universities”.
According to the adopted architectural solution, in the buildings of the UNC and NIC, not standard windows are installed, but stained glass ones, which assume a larger glazing area. Their size is 3-4 times larger than a regular window.
The buildings of the UNC and NIC, as well as the building of the flow auditoriums, have an atrium, but only of a smaller size. This is a central distribution space, illuminated through a zenith skylight located in the ceiling, the installation of which began this week in both buildings. Work is also continuing on the installation of an external storm and domestic sewage system, and work on laying the external block of “Sibit”. Work on installing temporary heat supply to the UNC has been completed.
— The construction of the second stage of the NSU campus will create the latest infrastructure for educational and research activities in the region. A pilot pharmaceutical production facility will be created on the site of a modern research center, and laboratories for training students in a wide range of areas will be located in the equipped premises of the educational and scientific center of the NSU Institute of Medicine. This will bring the educational process to a new level and implement the goals and objectives that will be laid down in the new national project “Youth and Children”, created on behalf of President Vladimir Putin, — commented Deputy Governor of the Novosibirsk Region Irina Manuilova.
— We are planning to launch new network educational programs — Medical Cybernetics and Pharmacy, an agreement on the implementation of this project was signed with the Moscow State University Engineering School within the framework of the Technoprom forum. The research center will be used to develop advanced areas in which NSU occupies a leading position — space instrumentation, synchrotron-neutron research, artificial intelligence and others, — noted NSU Rector, Academician of the Russian Academy of Sciences Mikhail Fedoruk.
In the building of continuous auditoriums, which also belongs to the second stage facilities, finishing works are being completed, commissioning works of engineering systems are underway. The construction readiness of the facility is 86%. In parallel, documents are being prepared for obtaining acts of admission in Rostekhnadzor and permission for commissioning. The construction of the building of continuous auditoriums is planned to be completed by the end of 2024.
Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.
Please note; This information is raw content directly from the information source. It is accurate to what the source is stating and does not reflect the position of MIL-OSI or its clients.
http://vvv.nsu.ru/n/media/nevs/campus-construction/façade-work has begun on the second-stage-facilities of the modern-nsu-campus/