MIL-OSI Russia: Dmitry Patrushev: Implementation of the “road map” will allow Krasnodar Krai to radically change the situation in the field of waste management for the better

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – An important disclaimer is at the bottom of this article.

Previous news Next news

Dmitry Patrushev made a working trip to Krasnodar Krai

During a working visit to Krasnodar Krai, Deputy Prime Minister Dmitry Patrushev held a meeting dedicated to the implementation of reforms in the field of solid municipal waste management. The meeting was attended by Minister of Natural Resources and Environment Alexander Kozlov, Governor of Krasnodar Krai Veniamin Kondratyev, heads of Rosprirodnadzor and the Russian Ecological Operator.

Krasnodar Krai is the most important tourist center of the country, so a significant amount of waste is generated here. Deputy Prime Minister Dmitry Patrushev spoke about the importance of waste recycling.

“In May 2024, the President set the region and the Russian Ecological Operator the task of providing a sufficient number of facilities for handling solid municipal waste. And in the country as a whole, the head of state set the goal of creating the necessary volume of capacity for processing, recycling and landfill disposal of waste over the next six years. Accordingly, the region needs to significantly increase the pace in this area,” Dmitry Patrushev noted.

Before the meeting, the Deputy Prime Minister got acquainted with the construction of the waste management complex, which will serve the city of Anapa, Slavyansky, Krasnoarmeysky, Temryuksky and Krymsky districts. After commissioning, waste will be sorted here using two lines with a total capacity of 300 thousand tons per year, and a composting section with a capacity of at least 110 thousand tons per year is envisaged.

In addition, during the flight over Krasnodar Krai, the Deputy Prime Minister inspected the Novorossiysk solid municipal waste landfill. Today, it is overflowing, but continues to accept waste. In accordance with the new “road map”, its reconstruction is planned.

Concluding the meeting, Dmitry Patrushev drew attention to the need for strict adherence to all established deadlines.

Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.

MIL OSI Russia News