Translation. Region: Russian Federation –
Source: Moscow Government – Government of Moscow –
In TiNAO, two modern fire stations with four parking spaces each have been built. They were built under the Safe City program, which is part of the Moscow City Targeted Investment Program. This was reported by Deputy Mayor of Moscow for Urban Development Policy and Construction Vladimir Efimov.
“New fire brigade buildings have appeared in the village of Pervomayskoye in the Filimonkovsky District and the village of Nikulskoye in Shcherbinka. Their total area is 5.3 thousand square meters. The construction of the facilities is fully completed. Now the permitting documentation is being processed and the equipment is being installed. This year, a fire brigade building for two parking spaces was also erected in the village of Rassudovo in the Bekasovo District. Thus, in 2024, three fire brigade buildings for 10 parking spaces will appear in TiNAO,” said Vladimir Efimov.
All the facilities were equipped with training towers with a climbing wall, sports grounds, and training fire hydrants. The builders also constructed gas boiler houses and material warehouses. Each housed rooms for fire-fighting equipment and its maintenance, a communications center, rest and dining rooms, classrooms, a gym, and a paramedic’s office with a treatment room. Convenient access roads were built to the special facilities.
“In TiNAO today two more buildings for fire brigades are being built in the Kommunarka area – in the settlement of Voskresenskoye and the village of Kartmazovo. Their construction is planned to be completed in 2025,” added the head of the capital’s Department for the Development of New Territories
On the instructions of Sergei Sobyanin, special attention in the capital is being paid to the quality of construction of infrastructure facilities that ensure the safety of the city and its residents.
According to the Chairman of the Committee for State Construction Supervision of the City of Moscow (Mosgosstroynadzor) Anton Slobodchikova, the construction of two fire stations for eight parking spaces was supervised by the department’s inspectors. During the entire period, 20 on-site inspections were carried out, to which specialists from the subordinate Center for Expertise in Research and Testing in Construction were involved. The specialists carried out a set of laboratory and instrumental studies to assess the compliance of the quality of work and materials used with the requirements of the design documentation.
New fire stations in TiNAO significantly increase the speed of response of special services to emergency situations. Today, the average time of arrival of crews to the fire site has been halved.
A fire station will be built in the village of VoskresenskoyeA new fire and rescue team has started working in TiNAO
Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.
Please note; This information is raw content directly from the information source. It is accurate to what the source is stating and does not reflect the position of MIL-OSI or its clients.
https://vvv.mos.ru/nevs/item/145938073/