Translartion. Region: Russians Fedetion –
Source: Government of the Russian Federation – An important disclaimer is at the bottom of this article.
Reconstruction of the overpass at the 6th km of the A-149 Adler – Krasnaya Polyana highway
March 5, 2025
Previous news Next news
Modernization of the road network is one of the fundamental tasks for ensuring the dynamic development of the entire country. For this purpose, bypasses of cities are being built. In particular, the Adler bypass project is being implemented, within the framework of which the overpass at the 6th km of the A-149 Adler – Krasnaya Polyana highway is being reconstructed. Today, the readiness of this artificial structure is 50%, Deputy Prime Minister Marat Khusnullin reported.
“Today, domestic tourism is actively developing in the country, including car travel, so it is important that the southern regions of the country and coastal areas are easily accessible. We are adding a new facility to the road framework in the Krasnodar Territory – the Adler bypass is under construction. It will increase the tourism potential of the region, and with the commissioning of this road, drivers will be able to get to the Sochi airport and Krasnaya Polyana faster. In addition, the new route will ensure the withdrawal of transit transport outside the resort area of Adler, which will help create comfortable conditions for local residents and tourists. The environmental situation in the coastal area of the Black Sea will also improve. Now, as part of this project, specialists are reconstructing the overpass at the 6th km of the A-149 Adler – Krasnaya Polyana highway, which previously had only one direction of traffic. After completion, the overpass will be expanded to two lanes. The overall readiness of the overpass has reached 50%, “said Marat Khusnullin.
According to the Deputy Prime Minister, the builders are currently gradually transferring sections of the overpass to temporary supports. Metal consoles are attached to them, which will increase the dimensions of the structure. 24 out of 34 consoles have already been secured. At the moment, the site has gained good momentum. Traffic on the updated artificial structure is planned to be launched at the beginning of the resort season this year. Residents and guests of Sochi will be able to move along the overpass in both directions. And in the future, the overpass will become part of a large interchange at the Eastern Portal of the Adler Bypass.
Chairman of the Board of the state company Avtodor Vyacheslav Petushenko added that work to expand the dimensions of the overpass began in November last year, and in the second quarter of this year, the installation of road surface layers will begin at the site.
“We will use a comprehensive technology for manufacturing asphalt concrete using the Superpave method on the overpass. With the help of this advanced system for designing the composition of the asphalt concrete mixture, the road surface on the overpass will be more resistant to cracking due to low temperatures, deformation and fatigue failure. The key advantage of this technology is the ability to predict the condition of the road surface over time, taking into account the influence of climatic factors in a particular region, as well as traffic intensity,” said Vyacheslav Petushenko.
Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.