Translation. Region: Russian Federal
Source: Moscow Government – Government of Moscow –
The capital has begun a large-scale reconstruction of the Pererva station of the second Moscow Central Diameter (MCD-2). A modern and convenient station integrated into the urban environment will be created here. The work is being carried out by Russian Railways together with the Moscow Government team.
“Currently, 4.1 thousand passengers use the station daily. Our goal is to bring the infrastructure to the uniform high standards of Moscow transport, to provide city residents with quality service along the entire travel route. A team of the best specialists is already working on this. We continue large-scale work on the comprehensive renovation of MCD stations on behalf of Sergei Sobyanin,” said Deputy Mayor of Moscow for Transport and Industry
Preparatory work has now begun on the territory of the Pererva station, including the organization of a construction camp and the reconstruction of utility lines.
MCD stations are being modernized as part of the comprehensive development of the transport system and urban infrastructure. The reconstruction project of the Pererva MCD-2 station is aimed at creating a comfortable infrastructure that meets the high standards of Moscow transport, as well as improving the quality of the urban environment and transforming the territory around it.
The station reconstruction project provides for a comprehensive upgrade of the passenger infrastructure. Two new pavilions with exits to Ilovaiskaya and Shosseynaya streets will be built here. A safe covered pedestrian crossing about 300 meters long will appear over the railway tracks, which will provide comfortable communication between the Maryino and Pechatniki districts in any weather.
A significant change will be the replacement of the existing coastal platforms with one island platform equipped with a protective canopy along the entire length. The entrances and exits will be equipped with escalators, and elevators will be installed for people with limited mobility. Ticket offices, terminals and sanitary rooms will be located in the pavilions. After the completion of the work, the total area of the station will be 5.5 thousand square meters.
Pererva station was opened in 1894. It was named after the village located here, known since the 16th century. Nearby is a motorcar depot of the same name, which is more than 87 years old. Here they inspect and repair the MCD electric rolling stock.
Today, Pererva connects three districts – Maryino, Lyublino and Pechatniki, where more than half a million city residents live. Construction is actively developing around the station: new residential microdistricts and infrastructure are appearing. Since 2019, the number of city residents living nearby has grown by more than 30 thousand people.
Sobyanin: Seven Moscow city railway stations will open in Moscow in 2025–2026Sobyanin: 140-meter pedestrian bridge connects two Tekstilshchiki metro stations
When designing the Moscow city station Pererva MCD-2, the reserve capacity for many years to come was taken into account, taking into account the intensive development of the areas around it.
Get the latest news quicklyofficial telegram channel the city of Moscow.
Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.
Please Note; This Information is Raw Content Directly from the Information Source. It is access to What the Source Is Stating and Does Not Reflect
https: //vv.mos.ru/nevs/ite/155361073/