Translation. Region: Russian Federal
Source: Novosibirsk State University – Novosibirsk State University –
In the building of the NSU flow auditoriums, which is related to the objects of the second stage of the new NSU campus, built within the framework of the national project “Youth and Children”, real giants among LED screens have appeared. These huge screens measuring 7.4 by 4.64 m are assembled using modular technology. NSU will become the only university in the Novosibirsk region, where such equipment is used for educational purposes.
There are five such screens in the new building: four in the flow classrooms and one in the conference hall. They not only complement the educational process, but also improve it, taking the image quality to a fundamentally new level. LED screens will replace the traditional lamp projectors that are installed in the flow classrooms of the current NSU educational building.
Marina Shashkova, Head of the Academic Policy Department at NSU, notes:
— Based on the infrastructure of the new campus, we create comfortable conditions for students to study and work on projects. Providing them with modern equipment is an important element for fulfilling this task.
LED screens are not only high-quality images, but also reliable and durable, as their service life is 100 thousand hours. Each of these screens is 638 modules combined into a single whole. They are easy to maintain, and if necessary, only the damaged module can be replaced without affecting the entire structure. This reduces repair costs and equipment downtime. Delivery, installation and warranty support were carried out by the Novosibirsk integrator company IVERT.
Thus, the new building of the NSU campus becomes not just a place for obtaining knowledge, but also a platform for modern technological solutions and innovations. LED screens are just one example of how technologies can improve the educational process. Like living canvases, they bring a fresh stream to lectures and presentations, making them brighter and more memorable.
The total area of the NSU flow auditorium building is 16 thousand square meters, permission to put the facility into operation was received in December 2024, and work is currently underway to equip it with furniture and technical equipment. Classes in the new building will begin in September 2025.
Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.