NewzIntel.com

    • Checkout Page
    • Contact Us
    • Default Redirect Page
    • Frontpage
    • Home-2
    • Home-3
    • Lost Password
    • Member Login
    • Member LogOut
    • Member TOS Page
    • My Account
    • NewzIntel Alert Control-Panel
    • NewzIntel Latest Reports
    • Post Views Counter
    • Privacy Policy
    • Public Individual Page
    • Register
    • Subscription Plan
    • Thank You Page

MIL-OSI United Kingdom: Work to stop road to Romsey from flooding starts soon

Written by

MIL-OSI Publisher

in

AM-NC, Climate Change, CTF, DJF, Environment, Europe, European Union, housing, KB, MIL-OSI, Natural Disasters, Politics, Transport, United Kingdom, Weather

Source: United Kingdom – Executive Government & Departments

Press release

Work to stop road to Romsey from flooding starts soon

A road with a history of flooding between Romsey and Stockbridge is being upgraded thanks to the Environment Agency and Hampshire County Council.

Upgrades to Stockbridge Road in Timsbury will help prevent it flooding

Work will start on Stockbridge Road, Timsbury, on 28 July and will take up to five weeks, depending on weather conditions.  Several improvements will be made, including: 

  • Better kerb drainage systems with non-return valves 
  • Elevating the kerb and road surface up to 30cm 
  • Improving the road’s resilience to flooding for a 200-metre stretch between Bagre Canal Road bridge and the Main River Test Road bridge 

The essential works by Hampshire County Council Highways mean the road must be closed during this time. Road users are advised to plan alternative routes but a clearly signposted diversion will be in place.  

This latest work builds on the successful £9.5 million Romsey Flood Alleviation Scheme completed in 2022, which protects 127 properties from River Test and surface water flooding. 

This section of road sits within a flood plain and experiences winter flooding, requiring temporary barriers and full road diversions that disrupt local travel and businesses. 

Simon Moody, Environment Agency area director for Solent and South Downs, said:

This targeted intervention will significantly reduce the risk of seasonal flooding on a key route into Romsey.  

By raising the road level and improving drainage infrastructure, we’re creating a safer, more resilient transport link that can withstand extreme weather events, which are becoming more frequent due to climate change. 

We thank the local community for its patience and cooperation during these essential works. 

Temporary flood barriers, like the above, have been necessary in the past as the road sits in a flood plain.

Councillor Nick Adams-King, Leader of Hampshire County Council, said:

This closure will cause disruption, and I’m sorry that means a diversion for those using the road. 

However, it’s good news the road closure is confined to the school holiday period and I welcome this further step towards the completion of Romsey’s much needed flood prevention scheme.  

These improvements to the road layout will reduce the risk of flooding at a spot that has seen recurring issues. Whilst this essential work is taking place, do please allow more time for their journey.

Background

  • Romsey has a history of flooding in the 1960s, 1995, 2000 and 2001. In the winter of 2013/2014, water overtopped Fishlake Stream and the Barge Canal, badly flooding 36 homes and 44 commercial properties with devastating consequences for families and businesses. 
  • The original Romsey Flood Alleviation Scheme was unveiled in July 2022 following completion in autumn 2021. That scheme included a tilting weir structure, earth embankments, and improvements to existing drainage systems. 
  • Residents can sign up for free flood warnings or calling Floodline on 0345 988 1188. 

Share this page

The following links open in a new tab

  • Share on Facebook (opens in new tab)
  • Share on Twitter (opens in new tab)

Updates to this page

Published 4 July 2025

MIL OSI United Kingdom –

←MIL-OSI United Kingdom: Mona Offshore Wind Farm development consent decision announced
Israeli military kills 15 in Gaza as Trump awaits Hamas reply to truce proposal→

More posts

  • MIL-OSI United Nations: World News in Brief: First UN mission to Syria’s Sweida, fresh displacement in Haiti, new lightning record

    August 5, 2025
  • MIL-OSI Canada: Edmonton resident charged with drug importation

    August 5, 2025
  • MIL-OSI USA: Schakowsky, Markey, Ruiz, Jayapal Introduce Dr. Paul Farmer Memorial Resolution Outlining 21st Century Global Health Strategy 

    August 5, 2025
  • MIL-OSI New Zealand: Minister announces SOE appointments

    August 5, 2025
NewzIntel.com

NewzIntel.com

MIL Open Source Intelligence

  • Blog
  • About
  • FAQs
  • Authors
  • Events
  • Shop
  • Patterns
  • Themes

Twenty Twenty-Five

Designed with WordPress