Translartion. Region: Russians Fedetion –
Source: Novosibirsk State University – Novosibirsk State University –
In the building of the educational and scientific center (ESC) Institute of Medicine and Medical Technologies NSU, which refers to the objects of the second stage modern campus of NSU, which is being built within the framework of the national project “Youth and Children”, work has begun on installing engineering systems, the first of which was the heating system. By February 15, it is planned to complete the installation of stained glass windows in the building of both the educational and scientific center of the IMMT NSU and the scientific research center of NSU. Active work is underway on installing a curtain wall facade at both sites.
The design for the future building of the NSU Educational and Scientific Center was developed taking into account the university’s plans for the transformation and development of medical education and the launch of new educational programs, such as “Medical Cybernetics” and “Pharmacy”. The building will house 12 practical courses, including biochemistry and molecular biology, histology, microbiology and virology.
The center will also house the largest simulation center in Siberia for practicing the practical skills of future doctors. There will be laboratories for cell technologies and immunotherapy, molecular virology, metabolomic research, molecular pathology, medical chemistry and other areas. The total capacity of the classroom fund will be 700 students.
The building will have quite a lot of “clean rooms”, the design of engineering systems for them has certain specifics. In particular, they involve the use of specialized supply and exhaust ventilation systems that operate autonomously and provide the room with sterile air of a given temperature, humidity and cleanliness.
In the buildings of the educational and scientific center of the NSU IMMT and the scientific research center of NSU, work is also underway to install stained glass windows, which are planned to be completed by mid-February, and a curtain ventilated facade. Facade work on both sites will be completed in April 2025.
At present, the technical readiness of the educational and scientific center is 21.4%, and of the scientific research center – 18.4%. The general contractor for the construction of the second stage facilities is the company “MONOTEK STROY”.
Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.