MIL-OSI Russia: The project for the construction of a house under the renovation program in Babushkinsky District has been approved

Translation. Region: Russian Federation –

Source: Moscow Government – Government of Moscow –

A four-section house will appear in Babushkinsky District under the renovation program. It will be built on Iskra Street. The construction project has already been approved, said the Chairman of the Moscow City Committee for Pricing Policy in Construction and State Expertise of Projects Ivan Shcherbakov.

“The apartment building is planned to be built on the site of two vacated houses at the address: Iskry Street, Building 13, Buildings 2 and 3. It will be a four-section building of variable number of storeys with a non-residential first floor. The presented design documentation has been developed in accordance with modern technical regulations, norms, rules and safety standards,” Ivan Shcherbakov noted.

The new building will be L-shaped. The entrances in the second and third sections will have double vestibules, and in the first and fourth — single ones. The first floor will house infrastructure facilities. The new building will have one-room, two-room and three-room apartments.

Specialists will create a barrier-free environment for comfortable movement of all residents. For example, entrances to the residential part will be designed with a minimum difference between the level of the sidewalk and the floor of the lobby, and some apartments will be equipped specifically for people with limited mobility.

“For the construction of this building with a total floor area of 25.9 thousand square meters, the Moscow Committee for Architecture has issued an urban development plan for a land plot of 1.4 hectares,” she added.

Juliana Knyazhevskaya, Chairman of the Committee for Architecture and Urban Development of the City of Moscow.

Previously Sergei Sobyanin reported, that 1.2 trillion rubles have been allocated in the draft budget for three years to implement the renovation program.

Consultations on the property and help from movers: Muscovites received more than a million notifications from the super service “Moving under the renovation program”Over six thousand Muscovites will begin resettlement under the renovation program in September and October

The renovation program was approved in August 2017. It concerns about a million Muscovites and provides for the resettlement of 5,176 houses. In 2023 alone, 59 new buildings in the capital were handed over for settlement and the resettlement of more than 47 thousand people was ensured. Sergei Sobyanin ordered to doublethe pace of program implementation.

Moscow is one of the leaders among regions in terms of construction rates and volumes. Over the past five years, within the framework of the federal project “Housing” of the national project “Housing and Urban Environment” the volume of construction and commissioning of residential properties in the capital has doubled – from three to five to seven million square meters per year. More information about this and other national projects being implemented in Moscow, you can find out here.

Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.

Please note; This information is raw content directly from the information source. It is accurate to what the source is stating and does not reflect the position of MIL-OSI or its clients.

https://vvv.mos.ru/nevs/item/145649073/

MIL OSI Russia News