MIL-OSI Russia: Marat Khusnullin: About 850 infrastructure facilities were introduced in Russia under the Stimul program

Translation. Region: Russian Federation –

Source: Government of the Russian Federation – An important disclaimer is at the bottom of this article.

Since 2018, the Stimul program has been implemented in Russia, thanks to which schools, kindergartens, medical institutions, highways and housing and communal services facilities were built for new residential areas in the regions. Since 2019, the program has been included in the national project Housing and Urban Environment, which ended in 2024.

Road in the Novo-Patrushevo microdistrict of Tyumen

“It is important for people to have a modern school, kindergarten, and clinic within walking distance of their home, to be able to drive into the yard via a quality road, and to have utilities provided without interruptions. All this was facilitated by the Stimulus program, thanks to which more than 1,000 events have been implemented in the country since 2018, including 848 infrastructure facilities and 169 technical connections. This made it possible to stimulate the commissioning of 61.4 million square meters of housing provided with the necessary infrastructure. The national project “Housing and Urban Environment”, and along with it the Stimulus program, have completed their work, but we continue to improve the living environment for people within the framework of the new national project “Infrastructure for Life”, “said Deputy Prime Minister Marat Khusnullin.

The Deputy Prime Minister added that during the operation of the Stimul program, about 1,600 km of roads were built and reconstructed. Among them are inter-block and intra-block roads, access roads, interchanges, as well as main streets that are important both for the city as a whole and for individual districts. In addition, the Stimul program made it possible to commission 203 educational facilities with more than 111 thousand places, 12 medical institutions with 5.5 thousand places, as well as utility networks with a length of more than 2 thousand km.

“In 2024 alone, 124 facilities were commissioned in the areas of housing projects participating in the Stimulus program. This stimulated the commissioning of 11.75 million square meters of new housing in developing areas. 51 engineering infrastructure facilities with a length of more than 450 km, 70 road infrastructure facilities with a length of more than 132.3 km and three schools for 3,129 students were created or reconstructed,” said Irek Faizullin, Minister of Construction and Housing and Public Utilities of the Russian Federation.

Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.

MIL OSI Russia News