Translation. Region: Russian Federation –
Source: Moscow Government – Government of Moscow –
In anticipation of winter, specialists from the city services complex washed the engineering structures. This was reported by the Deputy Mayor of Moscow for Housing and Public Utilities and Improvement Petr Biryukov.
“Before the onset of stable negative air temperatures, large-scale work was carried out to flush engineering structures. In total, about two thousand objects were put in order – bridges, tunnels, underground and overground pedestrian crossings, embankments, piers, fountains and monuments,” said Pyotr Biryukov.
The work included cleaning and washing of structural elements, concrete, metal and glass surfaces, railings and stairways.
Each structure is washed using a special technology with neutral solutions that do not damage the surface. Special attention is paid to small parts of monuments and fountains, which are cleaned manually. Alkaline solutions are chosen for washing tunnels and bridges.
About two thousand workers and over 250 units of equipment, including aerial platforms, watering machines and tunnel washing machines, were involved in washing the engineering structures.
The city’s outdoor lighting system has been switched to winter modeHeating systems in Moscow have been switched to winter mode
Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.
Please note; This information is raw content directly from the information source. It is accurate to what the source is stating and does not reflect the position of MIL-OSI or its clients.
http://vvv.mos.ru/nevs/item/145959073/