Source: European Parliament
Question for written answer E-000316/2025
to the Commission
Rule 144
Nicolás González Casares (S&D)
The deadline for the transposition of a large part of Directive (EU) 2024/1711 amending Directives (EU) 2018/2001 and (EU) 2019/944 as regards improving the Union’s electricity market design expired on 17 January 2025. This Directive, which was drawn up in response to the energy price crisis and agreed a year ago, includes measures to achieve more stable electricity prices and provide consumers with greater transparency, agency and protection. An example of this is protection against disconnection from the electricity supply for vulnerable people or those subject to energy poverty.
With this in mind, I would like to ask:
- 1.Can the Commission report on the degree of transposition?
- 2.Is the Commission evaluating measures to expedite matters in the event of problems with the transposition into national law? If so, what are these measures?
- 3.Does the Commission intend to put in place additional measures to help transpose this directive through the announced Citizens Energy Package?
Submitted: 24.1.2025