MIL OSI Translation. Region: Russian Federation –
Source: Moscow Government – Government of Moscow –
All utility systems, residential buildings, municipal facilities, equipment and machinery are ready for the autumn-winter period. The Moscow Government has considered the issue of the readiness of the capital’s housing stock and housing and communal facilities for the autumn-winter season of 2024/2025.
Preparations for the heating season for 74 thousand buildings, including 34.6 thousand residential buildings, 8.4 thousand social facilities and 30.8 thousand economic facilities, were carried out from May to August.
City services carried out preventive inspections and necessary repairs of engineering systems and equipment of boiler houses, central heating stations, large energy facilities, engineering networks of heat, gas, water and electricity supply.
The existing power reserves allow for a stable and uninterrupted supply of energy resources to consumers, as well as to meet the needs of promising city programs and infrastructure projects.
In case of possible failures and damage to utility networks, 1,093 emergency teams, 1,229 units of specialized equipment, as well as backup sources of electricity and heat supply have been prepared.
The required amount of road cleaning, engineering and other specialized equipment, as well as small mechanization tools, will be used to maintain urban areas and facilities. Snow will be disposed of at 51 stationary snow melting points.
Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.
Please note; This information is raw content directly from the information source. It is accurate to what the source is stating and does not reflect the position of MIL-OSI or its clients.
https://vvv.mos.ru/major/themes/11819050/
EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.