Source: European Parliament
The Transmission System Operators are currently working on a pan-European Bidding Zone Review and the report is expected early in 2025.
Once the report is finalised, it will be sent to all Member States who must take a decision within 6 months on how to address the congestion identified in line with Article 14(7) of the Electricity Regulation (EU) 2019/943[1].
The Commission is following this process closely and will work with the Member States to ensure that the Electricity Regulation is well-implemented.
The Commission’s role in deciding on a bidding zone reconfiguration is determined by a precise set of circumstances as set out in Article 14(8) of the Electricity Regulation.
- [1] https://eur-lex.europa.eu/eli/reg/2019/943/oj/eng
Last updated: 7 March 2025