MIL-OSI Russia: An educational complex will be built in the north of Moscow as part of the KRT project

MIL OSI Translation. Region: Russian Federation –

Source: Moscow Government – Government of Moscow –

The investor will build and transfer to the city an educational complex, as well as transport and engineering infrastructure facilities within the framework of the integrated development of the territory (IDT) of the former industrial zone of Bratsevo. This was reported by the Deputy Mayor of Moscow for Urban Development Policy and Construction Vladimir Efimov.

“Based on the results of the preparation and approval of the territory planning project, the city entered into an additional agreement to the contract for the integrated development of the site with the company that is redeveloping the former industrial zone of Bratsevo. According to the document, by 2030 the investor will build and transfer to the city an educational complex for 1,075 places, including a kindergarten designed for 325 pupils and a school for 750 students, as well as transport and engineering infrastructure facilities,” said Vladimir Efimov.

The territory is located in the north of the capital near the Baltiyskaya station of the Moscow Central Circle.

“The project for the integrated development of a 22-hectare territory is already being actively implemented. The investor has begun construction of the first-stage facilities. In total, by 2031, it is planned to build more than 550 thousand square meters of residential, social and public-business real estate on the site,” noted the Minister of the Moscow Government, Head of the Department of City Property of the City of Moscow

Maxim Gaman.

The company will also improve the courtyards and create a park with a boulevard. A promenade area of over two hectares will be laid along Vyborgskaya Street and Novopetrovsky Proezd. At each stage, the construction of the residential quarter on the site of the former industrial zone of Bratsevo is monitored by Mosgosstroynadzor.

According to the Chairman of the Moscow State Construction Supervision Authority Anton Slobodchikova, in August 2023, the committee gave permission to begin construction of the first stage of the project. It includes 10 sections of a residential building with 1,506 apartments. The developer began work on the site in the Voykovsky district on Admirala Makarova Street (building 2/16) in November of the same year. The area of residential premises will be 86.7 thousand square meters. The first stage of construction is expected to be completed in 2027.

Earlier Sergei Sobyanin told, that over 80 percent of KRT projects involve the construction of real estate near major transport facilities. Multifunctional city blocks are being created within the framework of the program. Roads, comfortable housing and all necessary infrastructure are being designed on the sites of former industrial zones and inefficiently used areas.

Currently, there are 236 KRT projects in Moscow at various stages of implementation, with a total area of over 3.1 thousand hectares. Their development is being carried out on behalf ofSergei Sobyanin.

Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.

Please note; This information is raw content directly from the information source. It is accurate to what the source is stating and does not reflect the position of MIL-OSI or its clients.

http://vvv.mos.ru/nevs/item/144418073/

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News