MIL-OSI Russia: Marat Khusnullin: Active work has begun on the Adler bypass from the Kudepsta and Vysokoye side

Translartion. Region: Russians Fedetion –

Source: Government of the Russian Federation – An important disclaimer is at the bottom of this article.

Previous news Next news

Construction of Adler bypass

In Krasnodar Krai, the implementation of a large-scale project to build a bypass around Adler continues. It will be part of a prospective road that will run from the federal highway M-4 “Don” to the city of Sochi. Currently, active work is underway on the western section of the future bypass, in the microdistrict of Kudepsta. This was reported by Deputy Prime Minister Marat Khusnullin.

“We work daily to create comfortable living conditions for citizens, including improving the transport accessibility of the regions. This plays a key role in the development of the economy and other industries. As part of the modernization of the road network in the south of the country, we are building a bypass of Adler. The new road will reduce travel time to the Sochi airport and Krasnaya Polyana and ensure the withdrawal of transit transport from the resort area of Adler. Currently, active work is underway in the Kudepsta microdistrict, on the western side of the future highway. Drilling of wells for the supports of the overpass leading to the Kudepsta sanatorium has begun at the site. Reconstruction of a section of the Sukhum highway is planned in this area, powerful retaining walls will be erected, and the access road to the sanatorium and the existing underground pedestrian crossing will be reconstructed,” said Marat Khusnullin.

The Deputy Prime Minister noted that the construction of the Adler bypass, with a total length of about 10 km, is divided into several stages. Most of the artificial structures in both the Kudepsta microdistrict and the village of Vysokoye will be erected as part of Stage IV. A positive conclusion from Glavgosexpertiza and permission for its construction were received in January of this year.

Also, according to the Chairman of the Board of the state company Avtodor, Vyacheslav Petushenko, in order to build the transport interchange of the Adler bypass with the A-147, concreting of the supports of the bridge crossing over the Kudepsta River is being carried out simultaneously in several sections.

“To save time on the delivery of necessary construction elements, several machines for the production of reinforcement cages were installed directly at the construction sites. At the same time, we are working in the village of Vysokoye in the Adler district, where the bypass will begin. Here, we have begun concreting the foundations of the U-turn overpass across the high-speed direction of the A-149 highway. We are also continuing to expand the overpass as part of the future interchange at the Eastern Portal. After reconstruction, it will become a two-lane one, and we plan to open traffic on it already in the current resort season,” said Vyacheslav Petushenko.

Currently, 74 units of special equipment and up to 400 specialists are involved in the construction of the Adler bypass.

Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.

MIL OSI Russia News