MILES AXLE Translation. Region: Russian Federation –
Source: Moscow Government – Government of Moscow –
An engineering building with physical education and health facilities with a total area of over 16,000 square meters was built on the territory of the Newton Plaza technology park, a multifunctional complex that includes high-tech enterprises. This was reported by the Minister of the Moscow Government, Head of the Moscow Department of Urban Development Policy Vladislav Ovchinsky.
The building is located at the address: 1st Nagatinsky proezd, building 10. It was built in the style of modern minimalism, so it blends in organically with the adjacent buildings of the technology park thanks to the use of similar facade materials.
“The multifunctional complex consists of seven above-ground, two underground and one basement floors. It includes laboratories, sports and fitness and administrative premises. The complex building is connected to the existing building of the innovation and industrial complex by an above-ground passage at the level of the first floor and an underground passage at the level of the minus second floor. In addition, an underground passage to the prospective development near the northern border of the site is provided,” said Vladislav Ovchinsky.
The engineering block contains laboratory and administrative premises, a control room, laboratories, laboratory utility rooms, technical rooms, a shared use center (coworking area), acoustic office cabins, auxiliary and technical rooms, and a balcony with a usable terrace.
The laboratories will conduct tests of electronic systems of cars and issue conclusions based on their results. They also plan to check the acoustic systems of cars and motorcycles for compliance with sound quality and noise level certificates.
The physical education and health block houses martial arts halls, functional training, group classes, fitness, a massage room and a hammam, as well as various service and administrative departments, tennis courts and a gym.
Based on the results of the comprehensive final inspection, the Committee for State Construction Supervision of the City of Moscow (Mosgosstroynadzor) issued a conclusion on the compliance of the facility with the design documentation.
“The engineering building was erected in five years, and throughout all stages of construction the committee monitored the progress of the work – a total of 29 on-site inspections were conducted at the site. Now the developer can prepare documentation to obtain permission to put the building into operation,” added the chairman of Mosgosstroynadzor
Earlier Sergei Sobyanin reportedon the completion of the construction of the first stage of the ZIL technology park, an investment priority project for the capital.
Technoparks to be built in 10 districts of the capital under the integrated territorial development programA technology park will be built in Maryina RoshchaEcological laboratory, city farm and chocolate studio. How the children’s technopark of food production Rosbiotech is organized
Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.
Please note; This information is raw content directly from the information source. It is accurate to what the source is stating and does not reflect the position of MIL-OSI or its clients.
https://vvv.mos.ru/nevs/item/145004073/
EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.