Translation. Region: Russian Federal
Source: Moscow Government – Government of Moscow –
In the SberCity microdistrict in Rublevo-Arkhangelskoye, construction of a three-story school for 1,030 students continues. Monolithic work has already been completed, and the laying of external and internal walls is nearing completion. This was reported by the Deputy Mayor of Moscow for Urban Development Policy and Construction Vladimir Efimov.
“On the territory of the microdistrict, active construction of a three-story school building with an area of 19.7 thousand square meters is underway. The construction of monolithic and reinforced concrete structures has been fully completed at the site, and the equipment of an individual heating point has been installed. At the moment, external and internal walls are being laid, the facade is being glazed, and internal and external engineering systems are being installed,” Vladimir Efimov noted.
The school will become part of the social infrastructure of the developing business and residential area of SberCity. In total, eight educational institutions are planned to be built there.
“The school under construction will have universal and specialized classrooms, as well as laboratory and research complexes. It will also have a media library, a full-cycle food block, a dance hall, sports halls, and two halls for events. The layout of the building will feature a functional division of the elementary school block and the space of the basic and senior schools. A sports cluster will appear on the adjacent territory. The courtyard will have courts for mini-football, basketball, volleyball, and gymnastics, with stands installed near them. In addition, areas for active games and quiet relaxation, as well as running tracks, are planned,” said the Minister of the Moscow Government, Head of the Department of Urban Development Policy of the capital.
Waiting areas with stands for charging mobile phones will be equipped for parents. The school will create comfortable conditions for children with disabilities.
Each stage of construction is supervised by the State Construction Supervision Committee. According to the head of the department Anton Slobodchikova, the school has been built on a land plot of about 2.7 hectares since spring 2024. During this period, inspectors conducted four on-site inspections, two of which involved specialists from the subordinate Expertise Center. During the instrumental control of the work performed and the materials used, an assessment was made of the conformity of the surface quality of reinforced concrete structures and masonry with the requirements of the design documentation.
Earlier, Sergei Sobyanin spoke about what the new one would be like educational complex in Vnukovo.
The construction of social facilities in Moscow corresponds to the goals and initiatives of the national project “Infrastructure for life”.
Get the latest news quicklyofficial telegram channel the city of Moscow.
Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.
Please Note; This Information is Raw Content Directly from the Information Source. It is access to What the Source Is Stating and Does Not Reflect
https: //vv.mos.ru/nevs/ite/155385073/