MILES AXLE Translation. Region: Russian Federation –
Source: Government of the Russian Federation – An important disclaimer is at the bottom of this article.
Yuri Trutnev heard reports on the implementation of the long-term plan for the comprehensive socio-economic development of the Petropavlovsk-Kamchatsky urban district
Yuri Trutnev, Governor of Kamchatka Krai Vladimir Solodov and Deputy Minister for the Development of the Far East and the Arctic Elvira Nurgalieva
Yuri Trutnev held a meeting with the management and instructors of the Kamchatka branch of the Voin center
Previous news Next news
Yuri Trutnev heard reports on the implementation of the long-term plan for the comprehensive socio-economic development of the Petropavlovsk-Kamchatsky urban district
As part of a working visit to Kamchatka Krai, Deputy Prime Minister and Presidential Plenipotentiary Representative in the Far Eastern Federal District Yuri Trutnev heard reports on the implementation of the long-term plan for the comprehensive socio-economic development of the Petropavlovsk-Kamchatsky urban district, and also held a meeting with investors and assessed the work of the Kamchatka branch of the Voin center.
The long-term plan for the socio-economic development of the Petropavlovsk-Kamchatsky urban district provides for the implementation of 17 events containing 52 objects for the period up to 2030. The key events of the master plan include the construction of a number of roads, including a bypass road from Petropavlovsk Highway to the residential area of Severo-Vostok and a public road to the Pacific Ocean coast. A campus for students of the city’s universities and colleges will appear in the capital of Kamchatka. It is planned to place educational institutions, clubs, public spaces, recreation and leisure areas for students on the campus territory. The construction of the children’s and youth scientific and educational center “Voskhod” has begun. Among the key events of the master plan is the improvement of the city center with the construction of a public center.
The master plan includes an environmental component. Within its framework, Kultuchnoye Lake in the city center will be cleaned. City landfills will also be reclaimed and an eco-technopark will be built. At the same time, integrated development projects will also be implemented in other areas: in the Severny microdistrict, the Zarechny microdistrict (near the airport), on Pogranichnaya Street, on Komsomolskaya Square, and also on the site of the existing regional hospital after its relocation to a new location. The construction of the bypass road TPP-1 – TPP-2 also plays a major role in the development of the regional capital.
This year, the design of the interactive planetarium and creativity center on Nikolskaya Hill, the improvement of the Historical Quarter, the walking area along 50 Let Oktyabrya Street, Leninskaya, Sovetskaya, Partizanskaya Streets and the Kultuchnoye Ozero ecopark, three sewage pumping stations were completed. The implementation of 26 events continues.
By the end of the year, work is planned to be completed at 15 sites. Work on the improvement of the central embankment and the park along Voytsesheka Street will be completed. The cultural heritage site (at 13 Krasintsev Street) will be restored as part of the art cluster, and equipment will be purchased for the creative industries school being created. The construction of sewage treatment facilities for the planned building of the regional children’s hospital will be completed. The design of a cable car, a building of the regional children’s hospital, a community center, an eco-technopark, two sewage treatment facilities (“Chavycha”, “29 km”) and five sewage pumping stations (“Rybny Port”, “Torgovy Port”, “Drama Theater”, “1/1E”, “Zarechnaya”) will be completed.
Work is actively underway on the following projects, the commissioning of which is planned for 2025. A road to Khalaktyrsky Beach is being built. Construction of a gas boiler house has begun in the Severny microdistrict as part of the Far Eastern Quarter project. The Yu.A. Gagarin Children’s Health Camp is being renovated. It is planned to begin major repairs of the road along Leninskaya Street in the city center. This year, a large and extremely important project for the region will also begin on the construction of an LNG regasification complex in Rakova Bay, with a completion date of 2025.
According to Deputy Minister for the Development of the Russian Far East and Arctic Elvira Nurgalieva, 12 billion rubles of a single presidential subsidy from the Ministry for the Development of the Russian Far East and 1.5 billion rubles of special treasury loans will be allocated for the implementation of the master plan for Petropavlovsk-Kamchatsky. The region has already received some of the funds for the design, major repairs and construction of facilities. The region will receive 0.6 billion rubles as part of a landscaping competition from the Russian Ministry of Construction. These funds were used to create an observation deck on Petrovskaya Sopka, and to improve the embankment in the city center along Ozernovskaya Kosa Street, a park along Voytsesheka Street, and Nikolskaya Sopka. This year, the Russian Ministry of Culture allocated funds for the purchase of equipment for the creation of a school of creative industries as part of the art cluster. The Russian Ministry of Energy will provide funding for the construction of an LNG regasification complex in Rakova Bay.
Thanks to the implementation of the master plan activities, positive dynamics have been observed in a number of indicators this year: the volume of construction work is growing (an increase of 5.5% in the first half of 2024), the number of people employed in the construction industry is increasing, and indicators in related industries have increased many times over: the cargo turnover of sea transport has increased by more than a quarter, and automobile transport has more than doubled.
Plans for 2025–2027 were discussed. In particular, it is planned to improve Nikolskaya Sopka by 2026 using funds from the federal project “Formation of a Comfortable Urban Environment”. It is planned to build five sewage pumping stations (“Zarechnaya”, “1/1E”, “Rybny Port”, “Torgovy Port”, “Drama Theater”). The deadlines for completing the construction of a public center on Lenin Square, a hotel and business center with improvement of the park on the territory of “Petropavlovskaya Gavan”, a fish market on the territory of “Prichal Mekhzavod” and a cable car have been set by the end of 2027.
“There are initial results. An observation deck has been built, the embankment is being improved. We only started implementing the master plan this year. And there is still a lot of work to be done,” Yuri Trutnev summed up the discussion.
During a meeting with investors, the Deputy Prime Minister noted that more than 250 investors with projects worth almost 300 billion rubles have taken advantage of state support in Kamchatka, with 106 billion rubles already invested. 79 projects have been commissioned, and more than 11,000 new jobs have been created.
According to Vladimir Solodov, Governor of Kamchatka Krai, 128.2 billion rubles were attracted to Kamchatka Krai in 2023. Investment growth was 60% compared to the previous year. Tourism is a priority industry. Last year, investment growth in this area was 53%. At the same time, 17 new hotels were built in 2023 alone, and the number of accommodations increased by 1,031 places.
Projects for the construction of hotels in the Kamchatka priority development area were discussed. The Cosmos Hotel Kamchatka company plans to build a five-star tourist and recreational complex. The Berloga company will create a five-star hotel complex with a thermal spa complex in the Elizovsky district of the Kamchatka priority development area. The implementation of a major investment project by a Kamchatka priority development area resident to create an international standard resort, the Three Volcanoes Park, was discussed.
The progress of completing the construction of the new passenger terminal of the Petropavlovsk-Kamchatsky International Airport (Yelizovo) was also considered. Several contractors are involved in the construction of the new airport complex of the Yelizovo airport. A total of 1,200 people and 50 units of special equipment are working on the construction of the facility. The overall construction readiness is 82%.
On the same day, Yuri Trutnev held a meeting with the management and instructors of the Kamchatka branch of the Voin center. “I always take the opportunity when I am in a territory where there is a branch of the center, to visit it, to see how things are going. Reviving patriotic education is our initiative with Sergei Vladilenovich [Kiriyenko]. It was supported by the President of Russia. And of course, we must monitor how things are going. The most important thing, in my opinion, the most positive thing, is that the feedback from the cadets is good everywhere. This shows that we started our work on time and that the desire for patriotism, the desire to be able to defend your homeland, to love it are in demand,” Yuri Trutnev opened the meeting.
Addressing the branch management and instructors of the Voin center, the Deputy Prime Minister emphasized the importance of work on patriotic education: “You are shaping the future by educating a new generation of Russians. There are currently 21 branches of the Voin center operating in the Russian Federation, including branches created in all liberated territories. Since the start of the Voin center, 35 thousand young men and women have been trained. And this year, the Voin center will train 30 thousand young people across the country.”
It was noted that the Voin center had developed a draft textbook, Basics of Initial Military Training. It is currently in the final stages of revision. This academic year, it is planned to test the publication by cadets of the Voin center and students of some educational organizations.
Director of the Voin Center branch in Kamchatka Alexander Burkhavetsky and Chairman of the regional branch of DOSAAF of Russia Dmitry Pavlov reported on the work of the Kamchatka branch. About 800 teenagers will undergo training in Kamchatka by the end of the year. Currently, construction of classrooms and arrangement of the territory of the Military Sports Training Center in the Yelizovsky District is underway. By the end of November 2024, it is planned to complete the construction of classrooms with a parade ground, a GTO site, a combined arms obstacle course, a parking lot and an entry group. In 2025, it is planned to complete the construction of a 500-meter gallery for sniping, arrangement of a tactical field, construction of several shooting galleries, installation of a facade for storming the building (for assault mountaineering), construction of a canteen, barracks for 120 people, preparation of a place for placing a tent camp for 160 people.
Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.
Please note; This information is raw content directly from the information source. It is accurate to what the source is stating and does not reflect the position of MIL-OSI or its clients.
http://government.ru/nevs/52936/
EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.