MIL-OSI Russia: Sergei Sobyanin spoke about plans to modernize Moscow’s energy supply system

Translation. Region: Russian Federal

Source: Moscow Government – Government of Moscow –

The capital continues modernization power supply systems. Sergei Sobyanin spoke about this in on your telegram channel.

“This helps ensure the stable operation of the entire Moscow energy system, which includes 145 thousand kilometers of power transmission lines, 188 power supply centers and 23 thousand distribution and transformer substations,” the Moscow Mayor wrote.

Source: Sergei Sobyanin’s Telegram channel @mos_sobyanin

According to him, energy consumption in the metropolis is constantly decreasing.

In 2025, special attention will be paid to increasing the efficiency and safety of the energy system, as well as creating additional power reserves. Large-scale work is being carried out for this purpose.

In particular, four combined heat and power plants are being modernized: TPP-21, TPP-22, TPP-23 and TPP-25. The work will extend the service life of the equipment and reduce specific fuel consumption. In addition, specialists will reconstruct two historical substations – “Central” and “Raushskaya”, as well as the substation “Lebedevo” in TiNAO.

At the moment, the reconstruction of the Golyanovo substation has been completed andreplacement of cable lines under the Moscow River, laid 70 years ago.

By the end of the year, they plan to renew more than 350 kilometers of cable lines and lay over 80 kilometers of backup lines for distribution and transformer substations.

Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.

Please Note; This Information is Raw Content Directly from the Information Source. It is access to What the Source Is Stating and Does Not Reflect

https: //vv.mos.ru/mayor/tkhemes/12951050/

MIL OSI Russia News