NewzIntel.com

    • Checkout Page
    • Contact Us
    • Default Redirect Page
    • Frontpage
    • Home-2
    • Home-3
    • Lost Password
    • Member Login
    • Member LogOut
    • Member TOS Page
    • My Account
    • NewzIntel Alert Control-Panel
    • NewzIntel Latest Reports
    • Post Views Counter
    • Privacy Policy
    • Public Individual Page
    • Register
    • Subscription Plan
    • Thank You Page

MIL-OSI United Kingdom: Environment Agency grants permit for Portland incinerator

Written by

MIL-OSI Publisher

in

AM-NC, CTF, DJF, Environment, Europe, European Union, KB, MIL-OSI, Politics, Transport, United Kingdom, Vehicles

Source: United Kingdom – Executive Government & Departments

Press release

Environment Agency grants permit for Portland incinerator

Conditions are being put on site operations and granting an environmental permit will not impact outcome of judicial review into site’s planning permission.

Conditions have been set in the permit on emissions and their monitoring, plant operation, waste type and quantity

The Environment Agency has today granted an application for a permit to operate a new non-hazardous waste incinerator in Portland port. 

Following a number of consultations, the agency agreed that Powerfuel Portland Ltd had met all of the necessary criteria needed for the environmental permit to be given for the proposed incinerator. Where an application meets the requirements of the Environmental Permitting Regulations (2016) the agency must issue a permit.

Conditions have been set in the permit on emissions and their monitoring, operation of the plant and the amount and type of waste to be accepted. The permit limits the waste that can be incinerated to refuse derived fuel – that is produced from domestic municipal solid waste (MSW) and commercial & industrial (C&I) waste unsuitable for recycling.

A spokesperson for the Environment Agency said:

We have carefully considered all of the submissions we received during the various consultations and we thank everyone who took the time to contact us with their views.

Background

The Environment Agency does not look at issues around vehicle movements to and from the site, working hours and whether or not the site is suitable for this kind of work. All of those are matters dealt with through the local authority planning process and is entirely separate from the environmental permitting process. 

Although the planning permission granted by the Secretary of State is currently subject to a judicial review, we do not consider the outcome of that process would impact our conclusions on the environmental permit. Nor will granting the permit affect the outcome of the court proceedings, which will be determined on their own merits.

Share this page

The following links open in a new tab

  • Share on Facebook (opens in new tab)
  • Share on Twitter (opens in new tab)

Updates to this page

Published 27 February 2025

MIL OSI United Kingdom –

←MIL-OSI United Kingdom: Increase of domestic timber to boost UK economy and housebuilding
MIL-OSI United Kingdom: Gatwick expansion unwanted, say Greens→

More posts

  • MIL-OSI United Nations: World News in Brief: First UN mission to Syria’s Sweida, fresh displacement in Haiti, new lightning record

    August 5, 2025
  • MIL-OSI Canada: Edmonton resident charged with drug importation

    August 5, 2025
  • MIL-OSI USA: Schakowsky, Markey, Ruiz, Jayapal Introduce Dr. Paul Farmer Memorial Resolution Outlining 21st Century Global Health Strategy 

    August 5, 2025
  • MIL-OSI New Zealand: Minister announces SOE appointments

    August 5, 2025
NewzIntel.com

NewzIntel.com

MIL Open Source Intelligence

  • Blog
  • About
  • FAQs
  • Authors
  • Events
  • Shop
  • Patterns
  • Themes

Twenty Twenty-Five

Designed with WordPress