MIL-OSI Russia: A two-section house with underground parking is being built under the renovation program in Kuzminki

MIL OSI Translation. Region: Russian Federation –

Source: Moscow Government – Government of Moscow –

On Yunyh Lenintsev Street (land plot No. 97/4) in the Kuzminki district, construction of a residential complex under the renovation program continues. This was reported by the Minister of the Moscow Government, Head of the Department of Urban Development Policy Vladislav Ovchinsky.

“Work is underway in the new building to install monolithic structures at the seventh floor level. It will consist of two sections of variable number of storeys. The building also includes underground parking for 57 cars,” Vladislav Ovchinsky specified.

The sections will contain 188 apartments with improved finishing, fully in line with renovation standards, approved by the decree of the Moscow Government. In order for the house to fit harmoniously into the architectural ensemble of the area, its facades will be made of suspended three-layer wall panels faced with sawn bricks of beige shades. In addition, metal baskets for air conditioners will be installed on the facades, and the entrance groups will be decorated with stained glass.

The area around the house will be improved and landscaped: trees and bushes will be planted, lawns will be laid and flower beds will be laid out, a children’s playground with a safe rubber surface, a sports ground, as well as an area for quiet recreation for adults will be built.

The construction of residential buildings under the renovation program is monitored throughout all stages by the Committee for State Construction Supervision of the City of Moscow (Mosgosstroynadzor). As its head noted Anton Slobodchikov, the construction of the house has been underway since May 2023. During this time, inspectors carried out five on-site inspections, during which they assessed the quality of the work and materials used.

“In addition to concreting, the site is performing waterproofing of the underground parking floor slab and installation of internal utility lines,” added Anton Slobodchikov.

All information about the renovation program is presented on the mos.ru portal. You can find out more about apartments and houses under the program by link.

The renovation program was approved in August 2017. It covers about a million Muscovites and provides for the resettlement of 5,176 houses. In 2023 alone, 59 new buildings in the capital were handed over for settlement, which allowed the resettlement of over 47 thousand people. Sergei Sobyanin instructed speed up the implementation of the renovation program by two times.

Moscow is one of the leaders among regions in terms of construction rates and volumes. Over the past five years, within the framework of the federal project “Housing” of the national project “Housing and Urban Environment” the volume of construction and commissioning of housing has doubled: from three million to five to seven million square meters per year. More information about this and other national projects being implemented in Moscow can be found Here.

Please note: This information is raw content directly from the source of the information. It is exactly what the source states and does not reflect the position of MIL-OSI or its clients.

Please note; This information is raw content directly from the information source. It is accurate to what the source is stating and does not reflect the position of MIL-OSI or its clients.

http://vvv.mos.ru/nevs/item/144475073/

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News